Qwest
Communications
- Seguin, TX to Austin, TX: Project manager for preliminary
mapping and survey. Entire route along Texas Department
of Transportation right-of-way with 5 miles of street construction
within the city limits of Austin, TX.
- Albuquerque, NM: Mapping and survey 75 miles in and around
Albuquerque area. All routes were along street highway right-of-way
or city streets with 25 miles parallel to Interstate 40
right-of-way.
IXC Communications
- Dallas to Houston: 200 miles of preliminary survey and
mapping. Necessary permit drawings as required; all mapping
utilized aerial photography in electronic format.
MCI
- Marfa to Dryden, TX: Preliminary mapping and engineering;
as-built mapping; first backbone route of MCI.
- Buffalo to Syracuse, NY: Preliminary mapping and engineering;
as-built mapping; majority of route down Niagara Mohawk
Power Line.
- Seattle to Kent, WA: Preliminary mapping and engineering;
as-built mapping.
- Independence, MO to Lincoln, NE: Preliminary mapping and
engineering.
- Salt Lake City, UT to Wells, NV: Preliminary mapping and
engineering.
- Denver, CO (Denver End Link): Preliminary mapping and
engineering.
- Austin to San Antonio, TX: Preliminary mapping and engineering.
- Eau Claire, WI to Minneapolis, MN: Preliminary mapping
and engineering.
- Austin to Granger, TX: Preliminary mapping and engineering;
as-built mapping.
- Austin, TX: GPS Test Section for five (5) miles of survey
and mapping for GPS accuracy.
- Wisconsin: Corrections on project that prime contractor
(CDI) could not produce.
- Sedalia, MO to Bonnet Mills, MO: Hi-rail and feasibility
study for new project; Route canceled.
- Chicago, IL to Milwaukee, WI: Preliminary mapping and
engineering, as-built mapping.
- Detroit, MI: Preliminary mapping and engineering into
metropolitan Detroit.
- Waco, TX: Preliminary mapping and engineering of route
into and around Waco, TX.
- Omaha, NE: Preliminary mapping and engineering of route
along Union Pacific Railroad to downtown MCI facilities.
- Austin, TX: Preliminary mapping and engineering of route
from Union Pacific Railroad to downtown Austin.
- State of Maryland: Various projects located within the
state of Maryland; mapping of various contractors and MCI
engineer's field notes; development of plans for construction.
- Coleman, FL to Auborndale, FL: Preliminary mapping and
engineering of route located on Florida State Highways and
city build.
- Gainesville, FL: Completed mapping for MCI due to other
contractor's failure to produce drawings.
Sprint
(Also known as US Telecom, GTE Sprint and US Sprint)
- Wichita, KS to Oklahoma City, OK: As-built mapping and
survey; route ran down I-35; all necessary permit drawings
to satisfy the federal Department of Transportation requirements.
- Fort Worth, TX to Sierra Blanca, TX: Preliminary survey
mapping; as-built mapping and survey along UP railroad right-of-way;
all necessary permit drawings including Texas Water District
around the Sierra Blanca area; close coordination with survey
supervisor, Right-of-Way supervisor; project entailed over
500 miles.
- Jacksonville, MS to Hammond, LA: Preliminary mapping and
surveying along railroad right-of-way; all necessary permit
drawings.
- Houston, TX to New Orleans, LA: Preliminary and as-built
mapping along railroad right-of-way.
- Nashville, TN to Memphis, TN: Preliminary mapping and
surveying and as-built; all necessary permits required for
project construction; total construction package.
- Cincinnati, OH to Louisville, KY: Preliminary and as-built
mapping; all necessary permit drawings.
- Cheyenne, WY to Council Bluffs, NE: Preliminary and as-built
mapping; all necessary permit drawings.
- Waco, TX to Austin, TX: Preliminary and as-built mapping;
all necessary permit drawings.
- Austin, TX to San Antonio, TX: Preliminary and as-built
mapping; all necessary permit drawings.
- San Antonio, TX to Corpus Christi, TX: Preliminary and
as-built mapping; all necessary permit drawings.
- Corpus Christ, TX to Brownsville, TX: Preliminary and
as-built mapping; all necessary permit drawings; route was
never built.
- Jacksonville, FL to Atmore, AL: Preliminary and as-built
mapping; all necessary permit drawings associated with the
Florida DNR; project consisted of over 500 miles of cable
routing.
- Seattle, WA to Eugene, OR: Preliminary and as-built mapping;
all necessary permit drawings as required by permitting
agencies, including those involving the different Indian
Nations around the Seattle area; entire route was built
along public right-of-way.
- Rialto, CA to Las Vegas, NV: Preliminary and as-built
mapping; all necessary permit drawings; project went across
Cajon Pass and following a power line into Las Vegas.
- Rialto, CA to Ontario, CA: Preliminary and as-built mapping,
engineering design; all necessary permit drawings; route
was basically along city right-of-way.
- San Diego, CA to the USA/Mexican Border: Route included
going down the city streets through the City of San Diego
and then down a trolley car route from San Diego to the
Mexican Border; this included all drawing necessary for
permitting; engineering; bid package.
- Santa Barbara, CA to Burbank, CA: Preliminary and as-built
mapping and surveying; all necessary permit drawings.
- Clarksville, WV to Collinsville, PA: Preliminary and as-built
mapping and surveying; all necessary permit drawings.
- Fargo, ND to Billings, MT: Preliminary and as-built mapping
and surveying; all necessary permit drawings.
AT&T Communications
1983-1997
- Dallas, TX to Weatherford, TX: Preliminary mapping, engineering
and as-built; 50% of route was along Union Pacific railroad
right-of-way and the other 50% of route was along Right-of-Way
already purchased by AT&T as part of their coaxil system.
This included all aspects of engineering, i.e., placement
of handholes, markers, regenerator sites, producing all
property plats, permit drawings for completion of project
to produce bid packages for construction.
- Shreveport, LA to Longview, TX: Preliminary mapping and
engineering on aerial photography base along highway right-of-way;
produced complete set of plans ready for construction bid
package.
- Temple, TX to Austin, TX: Preliminary mapping, engineering
and surveying; majority of route was along state highway
right-of-way; included all necessary permit drawings, property
plats and regenerator sites; preparation of drawings for
construction bid package and as-built mapping.
- Austin, TX to San Antonio, TX: Preliminary mapping, surveying,
engineering, and as-built; majority of route was along public
right-of-way; this also entailed the City of Austin environmental
impact requirements. This was the first telecommunications
company to build into the City of Austin.
- San Antonio, TX to Orange Grove, TX: Preliminary mapping
and engineering; as-built and surveying; project began in
downtown San Antonio and continued to tower site in Orange
Grove, TX, which is just outside Corpus Christi. Majority
of route was along public right-of-way; produced all necessary
permit drawings and environmental impact study.
- Fort Worth, TX to Temple, TX: As-built and preliminary
mapping and engineering along the Burlington Northern Railroad.
Project was given to our company by default of prime contractor.
As-built mapping was based upon inspector's reports and
as-built surveying.
- Amarillo, TX to Wayside, TX: Twenty-one (21) mile route
from AT&T's downtown offices in Amarillo to AT&T
tower site at Wayside, TX, paralleling an existing AT&T
fiber route. Preliminary mapping, engineering and as-built.
- Dallas, TX to Irving, TX: Preliminary mapping and engineering;
as-built and surveying; metropolitan route following the
city streets of Dallas and Irving. Prepared drawings for
the directional boring of Trinity River; placement of manholes;
total bid package. Entire route consisted of 4" conduit
system between AT&T's Dallas Central Office and termination
point at the City of Irving, TX.
- San Angelo, TX to Midland, TX: Preliminary mapping and
engineering; as-built and surveying; majority of route was
cross-country following existing AT&T coaxil route.
Project consisted of preparing ownership maps, alignment
sheets for pre-bid for construction purposes and preparing
all necessary property plats and permit drawings as required.
- Little Rock, AR to Gore, OK: Preliminary mapping and engineering;
as-built and surveying; aided in route selection; entire
route was on virgin right-of-way; all necessary property
plats and permit drawings; as-built completed with review
of contractor's inspectors reports.
- Tulsa, OK to Oklahoma City, OK: Preliminary mapping and
engineering; as-built and surveying. Project started at
5th & Elgin in downtown Tulsa to AT&T's central
office in Oklahoma City. Majority of project was on private
land; all necessary property plats produced, permit drawings
for construction package for bid; also included as-built
mapping of facilities. This included close coordination
with right-of-way department to assure the necessary survey
and drawings were performed as needed.
- Oklahoma City, OK to Glenrio, NM: Preliminary mapping
and engineering; as-built and surveying. Route followed
the outside right-of-way of Interstate-40. A portion of
the build went into downtown Amarillo to AT&T's central
office facilities thence back to paralleling I-40 to the
City of Glenrio, NM. This included necessary property plats
for easements, permit drawings, produced final package for
construction bids and provided as-built survey based upon
inspector's reports for completion for client.
- Amarillo, TX to Lubbock, TX: Preliminary mapping and engineering;
as-built and surveying; majority of project was on Texas
DOT right-of-way; provided necessary permit and ownership
drawings, property plats and legal surveys as required for
completion of project. Project terminated just outside city
limits of Lubbock.
WilTel
(also known as WORLDCOM)
- Los Angeles, CA: Preliminary mapping, engineering, as-built
and survey for route in downtown Los Angeles. Preparation
of necessary permit drawings; project consisted of city
street build for entire route and multi-duct conduit system.
- Houston, TX: Preliminary mapping and engineering; as-built
and surveying of route located in downtown Houston; provided
necessary permit drawings, construction plans for bid package.
As-built mapping was done based upon inspector's reports
and as-built survey information.
- Beaumont, TX: Preliminary mapping and engineering; as-built
and surveying of route located in downtown Beaumont; provided
necessary permit drawings, construction plans for bid package.
As-built mapping was done based upon inspector's reports
and as-built survey information.
- Baton Rouge, LA: Preliminary mapping and engineering;
as-built and surveying of route located in downtown Baton
Rouge; provided necessary property plats and permit drawings,
construction plans for bid package. As-built mapping was
done based upon inspector's reports and as-built survey
information.
US West Communications
- Phoenix, AZ and Scottsdale, AZ: Year-long project with
field office located in Phoenix, AZ. Work consisted of surveying
in equipment and tower sites. Prepared legal plats for all
surveys.
Warren Petroleum - Houston (Division
of NGC Corporation)
(Company Name changed to Dynegy Midstream Services, LP - effective
1998)
1992-1997
- Provided mapping support for this client with over six
(6) years of continuous service.
- Remapped entire Trident NGC Systems located in Texas,
Oklahoma and Kansas.
- Provided aerial photos as base maps for remapping project,
taking existing system maps and converting the information
to Autocad format and plotting aerial photography. This
project involved eleven different systems and over 15,000
miles of gathering lines. Work force for this project required
ten (10) people.
- Remapped six (6) gathering systems taking Autocad files
and mapping to an electronic quad background and converting
to NAD83; systems were set up in Autocad using paper space
and model space.
TransOK, Inc. - Tulsa
1987-1997
- Provided over eleven (11) years of mapping support for
Transok.
- Provided mapping and surveying on new transmission lines
and gas gathering lines. Prepared preliminary and as-built
alignment sheets, permit drawings, property plats and legal
plats for R/W acquisition, profile drawings for directional
boring and hydrostatic profile drawings.
- Updated and maintained Transok atlas drawings which cover
and contain all of Transok pipelines and gathering lines.
- Prepared and developed many drawings for presentation
and system maps used company-wide.
Southwest Gas Corporation - Las Vegas
1992-1997
- Over five (5) years of providing mapping, survey and engineering
for new pipeline projects located in Nevada, California
and Arizona.
- Project locations are as follow: Las Vegas, Tucson, Elko,
Carson City, Reno, Sparks, Lake Tahoe and Truckee.
- Mapping included aerial photography, necessary drawings
for FERC filing, environmental drawings for permitting,
especially in the Lake Tahoe Basin, permit drawings, preliminary
and as-built alignment drawings.
- Truckee project consisted of mapping and survey of the
Town of Truckee and surrounding area for a gas distribution
system. Project entailed over 400 drawings at a cost of
$514,00 and was completed in a 7-month period.
Rio Grande Pipeline Company
- Wink, TX to El Paso, TX: Preliminary and as-built mapping
of 200-mile pipeline system. Survey information obtained
by use of GPS survey methods. Legal plats in San Elizario
Grant area and permit directional boring drawings. Part
of this system extended into Mexico where all mapping utilized
the metric system and were in Spanish. Alignment drawings
utilized raster aerial images and were geo-referenced.
MapCo - Tulsa
- Produced emergency response maps for MAPCO's entire pipeline
system. Drawings were based on scanned county maps with
MAPCO's pipelines shown. The drawings displayed pipeline
mileposts, block and check valves, environmentally sensitive
areas, and phone numbers for field personnel, fire, police,
sheriff and highway patrol. Project consisted of over 150
drawings.
- Rocky Mountain Pipeline System: Coordination of all as-built
inspector's reports for as-built mapping consisting of over
1,100 miles of pipeline.
- Hobbs, NM to Kutz, NM: Preliminary mapping of 450 miles
of pipeline loop; necessary permit drawings, valve sites,
route maps, property plats for construction package.
Navajo Pipeline Co. - El Paso, TX
- Preliminary and as-built mapping of a 100-mile pipeline
system. Survey information obtained by use of GPS survey
methods. Produced property plats as requested by right-of-way
department.
Williams Field Services - Farmington,
NM
- Provided mapping support over 6 year time frame
- Prepared legal plats for state, private, and Indian land
and station sites for Williams Gas Gathering System located
in and around the Farmington area.
Express Pipeline - Montana and Wyoming
- Prepared legal plats for state lands across
Montana and Wyoming. Plats were prepared from GPS survey
data.
Texaco Trading and Transportation Co.
- Various Projects
- Developed and produced system maps of entire Texaco pipeline
systems nationwide.
- Lost Hills to Oildale, CA: Provided preliminary and as-built
mapping for dual pipelines for a 16" gas and 20"
crude line. All necessary permit drawings and R/W plats.
- Lost Hills to Coalinga, CA: Provided preliminary and as-built
mapping for 12" pipeline.
- Coalinga, CA to San Ardo, CA: Provided preliminary and
as-built mapping for 16" pipeline.
- Pearsall, TX: Provided preliminary and as-built mapping
for 53 miles of pipeline.
- Kansas: Provided as-built survey and mapping for 53-mile
pipeline.
Enron Corporation - Transwestern Pipeline
- Prepared preliminary and as-built mapping of 200 miles
of loop lines located in and across Arizona. Prepared property
plats and legal plats for entire route.
Conoco, Inc.
- Ponca City, OK to Wichita, KS: Provided as-built survey
and prepared legal plats on all tracts on 70-mile project.
Legal plats totaled over 200 plats signed by Oklahoma Licensed
Surveyor.
- USA/Canadian border to Billings, MT: (Glacier Pipeline)
Remapped on new aerial photography and converted to electronic
files manual drawings.
Williams Pipeline Co.
- Preliminary survey and plats on various projects located
in Kansas.
Northwest Pipeline Corporation
- Colorado, Idaho, Utah and Washington: Reduction of shallow
pipe survey with ground elevations and top of pipe elevations.
Provided survey information in report form for identifying
locations of shallow pipe. Work accomplished with data collectors
and physical probing of pipe. Reduction of field work and
accuracy of closures proven out in Tulsa office.
Chevron Pipeline Co.
- Point Conception, CA to Gaviota, CA: Preliminary survey
and mapping of pipeline route.
American Central Gas Co.
- Western Oklahoma and Eastern Texas: Developed and produced
system maps; prepared presentation maps to aid in their
effort to obtain new client.
Cimarron Gas Co.
- Western Oklahoma: Mapping and survey for gas gathering
system.
Plains Marketing & Transportation
- Cushing, OK: Mapping and survey for feeder lines for new
tank farm.
Vintage Petroleum, Inc.
- Western Oklahoma and Galveston Bay Area: Developed and
produced system maps.
Heritage Gas Co.
- Western Oklahoma: Developed and produced system maps.
Colonial Pipeline Company
- Greensboro, NC to Danville, VA:
Preliminary mapping of 75 mile pipeline system; necessary
property plats and permit drawings for bid package.
- Greensboro, NC to Lynchburg, VA:
As-built mapping of 150 mile pipeline system; as-built information