PetroHawk (2008 – Present)
Haynesville Shale – 300+ miles of various sized gathering systems in NE Louisiana
Kinder Morgan (2005 – 2008)
Rockies Express Pipeline (REX) – 1,340 miles of 42” pipeline running from Cheyenne, Wyoming to Ohio; 300+ property plats for right-of-way acquisition and spreadsheet of all pipe and material installation
Sempra Energy (2004 – Present)
Cameron Pipeline (Phases I and II) – 36 miles of 42” pipeline; longest HDD for 42” pipe at 6,700 feet
Port Arthur Pipeline – 70 mile pipeline; involved crossing 2 shipping channels, Lake Sabine, Houston River, Little River and the West Calcasieu River; produced property plats
Port Arthur Terminal – Relocation of Texas State Hwy 87 and 3 pipelines (3.5 miles)
Liberty Pipeline – 40 mile pipeline; boundary survey for under storage and well locations
Survey & Mapping Standards – Prepared both survey and mapping standards for all future Sempra projects
ONEOK (2000 – Present) – Providing over 8 years of survey and mapping support for various pipelines located in central and western Oklahoma
Woodford Shale – 70 mile 8” pipeline
Atlas to Sweetwater – 21 mile pipeline
Wynoka to Hopeton Booster – 4 mile pipeline
Carney Loop – 6 mile pipeline
PODS Conversion – Legacy data for PODS
Pioneer to Satanta Connection – 3 mile helium line
Kelton – 12 mile pipeline
LeFores Lateral – 8 mile pipeline
Nash Connection – 10 mile pipeline
Gas Gathering System Maps – 17,000+ miles in Texas, Oklahoma and Kansas
John Chance (2008 – Present)
Kinder Morgan Pipeline – 100 miles of As-Built survey in Louisiana
Denbury Pipeline – 300 miles of 24” CO2 from Louisiana to South Houston; Construction Staking and As-Built survey
Pecan Pipeline (April 2009 – Present)
Stroud to Cushing – 17 miles of crude oil pipeline with delivery to Cushing, OK
Enbridge Energy (2003 – Present)
Terrace III Expansion – 110 miles of 36” pipeline from Clearbrook, Minnesota to Superior Wisconsin
East Texas Gas Pipeline System – Mapping on various gas systems and maintenance of H2S Emergency Evacuation Plan
Ozark Pipeline – Remapping projects from Cushing, OK to St. Louis, MO
New Dominion Resources (2003 – Present)
Survey and mapping for pipelines and new well locations throughout Oklahoma
Dynegy Midstream Services (1998 – 2005)
GIS System Maps – Converted and developed ArcView GIS System Maps of the following gas gathering lines:
| · North Versado |
2,700+ miles |
| · Versado |
1,700+ miles |
| · Versado |
500+ miles |
T-4 Permit Submittal – Prepared T-4 Permit Drawings for Texas Railroad Commission of Gas Gathering Systems and performed updates as needed
| · Chico |
1,428 miles |
| · East Texas |
164 miles |
| · Kellerville |
404 miles |
| · LeFors |
275 miles |
| · Monument |
41 miles |
| · Myrtle Springs |
312 miles |
| · Puckett |
28 miles |
| · Shackelford |
1,962 miles |
| · Sherman |
230 miles |
| · Waskom |
39 miles |
Lake Charles – Surveying and mapping of 110 miles of various pipelines located in the Sabine Refuge area
Gas Gathering and Transmission Lines – Mapping and aerial photography for 300+ miles in Texas and Louisiana
Plant Sites – Mapping and aerial photography for 53 plant sites ranging from 2-mile radius to 7-mile radius for risk management program
GIS System Pilot Program – Survey and Mapping of a 230 mile gas gathering system; this was a pilot program to test GIS System for corporate rollout
H2S Emergency Evacuation Plan – Developed Radius of Exposure Plan, compiled documentation of all homes and business located within the
radius of exposure, prepared LEQ maps for emergency call system and provided aerial photography
Plains Pipeline, LP (2004 – Present)
Cushing to Caney Pipeline – 100 mile 16” crude oil pipeline; involved 19 directional drills, including crossing of the Cimarron River, Keystone Lake (6,000’ drill) and Skiatook Lake (4,900’ drill); involved route selection, preliminary survey, construction staking and As-Built survey and mapping
Mapping Support – provide mapping support for the Oklahoma City and Houston offices
Scissortail Energy, Inc. (2005 – 2007)
Southern Dome Pipeline – Preliminary and As-Built survey and mapping for 20 miles of 12” pipeline and 8 miles of 6” pipeline in the Oklahoma City area
Koch Pipeline (2004 – 2005)
PODS – Phases I and II – 4,000 miles of pipeline routes, 1,900+ alignment sheets and over 49,600 entry records
Zyback Lateral – survey and mapping of 16 miles pipeline near Canadian, TX
Reliant Energy Field Services
Reliant Energy Gas Transmission Co. – (2001 – 2003)
Preliminary survey and mapping for various pipeline projects ranging from compressor site to major transmission lines. Mapping includes all permit drawings, legal property plats and alignment sheets.
Superior Pipeline Company – Tulsa, OK – (2000)
Development of proposed Systems Map located in SE Oklahoma
Sulphur River Pipeline – Edgewood, TX – (2000)
Update of H2S Radius of Exposure plan for H2S System located in East Texas.
Centerpoint Energy – (2001 – 2006)
Various pipeline projects located in Arkansas and Oklahoma
Enogex – (2001 – Present)
Various pipeline projects located in Oklahoma
Oklahoma Gas & Electric – (2004)
Ground survey of OGE’s entire mainline distribution system; over 1,400 miles of survey completed within 9 weeks.
Williams Energy Group (1999 – 2001)
Aspen Pipeline – 240 mile pipeline in Utah
Pipeline Relocations – various relocations throughout the United States
Grand River Dam Authority
– Pryor, OK
August 2002 - Present
- Preliminary survey and mapping for 2 power transmission
lines located in Washington County, Oklahoma. Project located
within state and county right-of-ways.
Williams
Communications – Tulsa, OK
1998 – Present
- Houston – Atlanta: Recreate over 570 drawings
along Transco Pipeline Route. Project length approximately
711 miles. Rebuilt landbase with ownership, showed as-built
locations to existing pipelines and all as-built data for
2 fiber optic cables.
- Kansas City – Chicago: As-built mapping of
various road routes to Chicago P.O.P. site. Route was approximately
215 miles in length.
- Doraville, GA: As-built mapping
- Jacksonville, FL Interconnect: As-built mapping
- Nashville - Cincinnati: As-built mapping
- Peoria, IL - Chicago: As-built mapping
- Transco II Overbuild
- Blacksburg, SC to China Grove, NC:
Mapping and survey of 80 miles along railroad right-of-way
and 9 miles of Road Build
- Charlotte, NC: Mapping and survey
8 miles of Metro Build
- Houston, TX: Mapping and survey 10
miles City of Houston Metro Build
- Doraville, GA: Mapping and survey
9 miles of Metro Build
- Interconnects (various locations):
Provide mapping and survey for interconnects of various
lengths in the following cities:
- Denver, CO
- Lubbock, TX
- Amarillo, TX
- Wichita Falls, TX
- San Antonio – El Paso: Provide As-built
drawings from field inspection reports and red-lined drawings
- Huntington, PA to Herndon, VA (Washington,
DC): Mapping, survey and right-of-way of approximately
250 miles, utilizing railroad, public and pipeline rights-of-way.
Approximately 200 miles located on Norfolk Southern/T-Cubed
right-of-way
- Puyallup to Seattle: Mapping and survey
approximately 40 miles utilizing public rights-of-way.
Provide utility research, prepare permit and construction
drawings.
- Atlanta to Chicago: Mapping and survey
for a segment from Tennessee/
Kentucky state line to Louisville, KY, approximately 200
miles in length, utilizing public right-of-way, railroad
right-of-way, and pipeline right-of-way.
- Segment from Louisville, KY to Cincinnati,
OH approximately 100 miles in length, utilizing public right-of-ways,
railroad right-of-ways, and pipeline right-of-ways.
- Segment from downtown Atlanta POP to a point
approximately 20 miles out from POP site. Public right-of-way
entire route.
- Houston to Los Angeles: Mapping and
survey for a segment from San Antonio to El Paso, TX. Route
approximately 530 miles in length, utilizing Interstate
I-10 and I-20. Route abandoned due to Texas D.O.T. New
route selected by Williams Co. utilizing right-of-way along
U.S. Hwy 90 and Union Pacific Railroad for route between
San Antonio and El Paso. Route consisted of approximately
552 miles.
- New Orleans to Tallahassee: Mapping
and survey for project segment from Mississippi/Alabama
state line to Alabama/Florida state line, approximately
90 miles.
- Mapping and survey of a 40 mile segment from
DeFuniak Springs to Ebro, Florida.
- Prepared Corps of Engineers drawings and drawings
for state-owned waters in the State of Louisiana.
- Miami to Tallahassee: Mapping and survey
for a segment from Tallahassee to Perry, Florida. Route
approximately 90 miles in length.
- Houston, TX to Manassas, VA: Posting
of as-built fiber optic information, approximately 1,300
miles along Transco Pipeline right-of-way.
- As-built mapping of 19 miles of fiber optic
cable located in metropolitan Houston.
- As-built mapping of fiber optic routes at Atlanta,
GA, Spartanburg, SC, Butler, AL, and Liberty, TX, totaling
approximately 82 miles.
CommTech Engineering
- Brookhaven, MS
- 190 miles of preliminary survey and mapping of Fiber Route
in Maryland, Delaware and Pennsylvania for AT&T and
PF Net joint build, utilizing existing AT&T right-of-way
and public right-of-way.
Schmidt Consulting
- Scottsdale, AZ
1998
- Prepared legal plats for site acquisition for approximately
25 cellular tower sites in and around Salt Lake City, UT.

|